.

Browsing by Author "Tommelein, I."

LAUR Repository

Browsing by Author "Tommelein, I."

Sort by: Order: Results:

  • Zouein, Pierrette; Tommelein, I. (2016-02-18)
    Efficiently using site space to accommodate resources throughout the duration of a construction project is a critical problem. It is termed the “dynamic layout planning” problem. Solving it involves creating a sequence of ...
  • Zouein, Pierrette; Tommelein, I. (2016-02-18)
    Selecting construction methods, scheduling activities, and planning the use of site space are key to constructing a project efficiently. Site layout and activity scheduling have been tackled as independent problems. Their ...
  • Zouein, Pierrette; Tommelein, I. (2016-02-18)
    The layout of temporary facilities on a construction site necessarily changes over time, so the term dynamic layout is used to describe a sequence of layouts spanning the entire duration of construction of a project. Many ...